DNO applications

DNO application help — North East

Every solar PV, battery storage, EV charger and heat pump install in the UK needs to be notified to your Distribution Network Operator (DNO). We handle the G98 or G99 application as part of every install — you never have to deal with the DNO directly.

G98 vs G99 — quick reference

What's the difference between G98 and G99?

G98

Notification only

For single-phase generation up to 16A per phase (~3.68 kW). Includes most domestic solar PV systems and EV chargers. Notification is post-install — DNO is told within 28 days of commissioning. No upfront approval needed.

G99

Application + approval

For systems above 16A per phase (>3.68 kW single-phase or any three-phase). Larger solar arrays, commercial systems, battery storage above certain thresholds, V2H/V2G chargers. Requires DNO approval BEFORE install — typically 11-45 days for residential, longer for commercial.

Need DNO application support?

Every AMP Renewables install includes the G98 or G99 application handled by our in-house engineers. You never deal with the DNO directly.