How we install

From free quote to ongoing aftercare — the AMP install process

The full step-by-step process for every install. Single team, single point of contact, fixed-price quotes, in-house engineers (never subcontracted). 8 steps, 6-10 weeks typical end-to-end.

  1. 1

    Free enquiry + initial scoping

    15 minutes

    Call or use the online quote form. We ask 4-5 questions: postcode, property type, current setup, what you're thinking about, rough timing. No high-pressure sales call. You get a same-day response from our office team scheduling the next step.

    How we go deeper than competitors

    If solar PV, we run a 3D roof model from satellite imagery before the call to give you a rough kWp + cost band. If heat pump, we estimate property type and likely BUS grant eligibility. If EV charging, we check Northern Powergrid supply capacity from the postcode.

  2. 2

    Free site survey

    60-90 minutes on site

    A surveyor visits your property at a time that works for you (weekday evenings + Saturdays available). Full property walk-around: roof inspection (or attic for cable routing), main fuse rating, current heating system, hot-water demand, garden access, parking layout. No obligation, no pressure to sign.

    How we go deeper than competitors

    For heat pump surveys we run a full room-by-room heat loss calculation to BS EN 12831. For solar we run a 3D model with full shading analysis. The survey takes longer than rushed competitors because we actually need the data to design properly.

  3. 3

    Designed proposal + fixed-price quote

    5-7 working days

    A full designed proposal — system specification, projected generation/savings/payback, equipment data sheets, scaffolding requirements, grant pathway (BUS, ECO4, OZEV, PSDS as applicable), and a fixed-price quote with no hidden extras. You get this as a PDF emailed within a week of the survey.

    How we go deeper than competitors

    Heat pump proposals include the heat loss calc, emitter compatibility analysis (which radiators need upgrading and which don't), and projected SCOP. Solar proposals include 25-year financial model with conservative degradation assumptions. EV charger proposals include the DNO G98/G99 path.

  4. 4

    Decision, agreement, deposit

    When you're ready

    No deadlines or "today-only" pricing. When you're ready to proceed, we send a contract (RECC consumer-protection compliant), take a deposit (typically 10-25%), and book the install date. We never store payment details and don't use automated billing.

    How we go deeper than competitors

    If you want changes to the proposal (size up, size down, change battery brand) we re-quote at no charge. Our typical decision-to-install window is 4-8 weeks for residential and 8-16 weeks for commercial. Faster turnaround on urgent boiler/heating replacement.

  5. 5

    Pre-install preparation

    2-4 weeks before install

    We handle: DNO application (G98 or G99 — Northern Powergrid, NGED or SPN as applicable), MCS notification, building control where needed, planning permission consultation if heritage or conservation area, scaffolding booking, equipment delivery to our warehouse, and a final pre-install confirmation call.

    How we go deeper than competitors

    You don't contact the DNO, MCS, building control or scaffolding company yourself — we do all of it. The pre-install call confirms exact dates, access arrangements, parking, pets, and any house-specific concerns.

  6. 6

    Installation day(s)

    1-5 days depending on system

    Our own engineers — never subcontracted. Solar typically 1-2 days. Heat pumps 3-5 days. EV chargers same-day. Boilers same-day or 2 days for awkward swaps. We work tidy, cover floors, brief you on what's happening each morning, and clear the site each evening.

    How we go deeper than competitors

    Heat pump installs include radiator upgrades on the same visit if specified. Solar includes inverter setup, app handover, and a working SEG-ready system at end of day 2. EV chargers include Octopus Intelligent Go setup if you're on that tariff.

  7. 7

    Commissioning, certification + handover

    Final 2-3 hours of install

    System commissioning to MCS/G98/G99/F-Gas/Gas Safe standards as applicable. Customer walkthrough — how to use the app, what the readings mean, what to do if something looks wrong, when to expect your first bill change. Handover pack: MCS cert, DNO confirmation, BUS application receipt (if heat pump), warranty registration confirmations, SEG sign-up steps (if solar), tariff recommendations.

    How we go deeper than competitors

    Every install ends with a working, certified, registered system. You leave the handover knowing how to use it, where to find help if needed, and what financial milestones to expect over the next 12 months.

  8. 8

    Ongoing aftercare

    Annual + on-demand

    Annual service contract (optional but recommended): performance audit, software updates, filter cleans (heat pumps + AC), F-Gas compliance check (AC + heat pumps with HFC refrigerant), gas safety check (boilers). 24-hour callout for warranty issues. Direct phone line to our engineering team — never an offshore call centre.

    How we go deeper than competitors

    We typically service heat pumps + boilers annually (mandatory for warranty), AC every 2 years, solar every 3 years (panels are passive — mostly visual inspection + inverter check). We bundle multi-system service contracts to reduce visit count for customers with full installs.

40+

Years in trade

family business since 1985

100%

In-house engineers

no subcontracting

20+ years

fully certified

continuously accredited

12 mo

Customer support

workmanship warranty

Our accreditations

Accredited, certified, and backed by independent standards

NICEIC Approved

D124458

Electrical contractor

Gas Safe Register

947841

Gas appliances

Heat Geek Trained

Heat pump design specialists

TrustMark

Government endorsed

Quality scheme

SafeContractor

Approved

H&S accredited

ISO 9001

2015

Quality management

ISO 14001

2015

Environmental management

ISO 45001

2018

OH&S management

PAS 2030

:2019

Retrofit standard

NAPIT

Member

Electrical inspection

F-Gas Certified

Air conditioning refrigerant

NICEIC Approved

D124458

Electrical contractor

Gas Safe Register

947841

Gas appliances

Heat Geek Trained

Heat pump design specialists

TrustMark

Government endorsed

Quality scheme

SafeContractor

Approved

H&S accredited

ISO 9001

2015

Quality management

ISO 14001

2015

Environmental management

ISO 45001

2018

OH&S management

PAS 2030

:2019

Retrofit standard

NAPIT

Member

Electrical inspection

F-Gas Certified

Air conditioning refrigerant

Every accreditation listed is independently verified. We carry the registration numbers — ask for any on request.

Common questions about our install process

How long does the whole process take from enquiry to install?

Typical residential: 6-10 weeks. Quote within 5-7 days of survey. Decision typically 2-3 weeks. DNO + pre-install prep 2-4 weeks. Install 1-5 days. Commercial: 10-20 weeks total depending on scale and grant requirements. Urgent boiler/heating replacement can compress to 1-2 weeks where needed.

Do I have to pay for the survey?

No. The survey is free with no obligation. We won't leave a deposit-pressure quote on the kitchen table — you get a written proposal emailed within a week, and you decide in your own time without follow-up sales calls.

What deposit do you require?

Typically 10-25% on contract signing. Larger systems (heat pump retrofits, commercial solar) usually 10-15%. Smaller installs (single EV charger) usually 25-50% to cover equipment ordering. Balance on commissioning. We're RECC-registered so all deposits are insurance-protected.

Do you use subcontractors?

No. Every engineer on your install is directly employed by AMP Renewables. We hold the relevant certifications in-house (MCS, NICEIC, Gas Safe, F-Gas, Heat Geek) so we don't need to subcontract specialist work. The one exception is scaffolding which is supplied by a long-standing partner.

How quickly can you start an install?

Depends on equipment availability and DNO approval times. Solar + EV: typically 4-6 weeks from contract sign. Heat pump: typically 6-10 weeks (DNO + BUS grant pathway adds 2-3 weeks). Boiler emergency replacement: 1-2 weeks. Commercial: 8-16 weeks depending on scale.

What if I want changes to the proposal?

No charge for re-quotes. If the survey reveals you want a different size system, different battery brand, different inverter, additional zones, etc., we re-quote at no cost. We assume the first proposal isn't always right — the discussion is part of the process.

Can I get an install certificate from you?

Yes — every MCS-eligible install (solar PV, heat pump, biomass) comes with an install certificate handed to you on commissioning. The MCS cert is required for SEG (solar) and BUS grant (heat pump) applications. You receive a physical copy in the handover pack and a digital copy by email.

What aftercare is included?

12-month workmanship warranty included on every install. Manufacturer equipment warranties (5-25 years depending on product) handled by us — you call us, we handle the manufacturer claim. Optional annual service contracts (£85-£350/year depending on system count) extend manufacturer warranties to maximum length.

Ready to start at step 1?

The first step is a 15-minute phone call. No high-pressure sales, no obligation, no spam follow-up.